Steel gate lead times: welding, dipping and fitting
Made-to-measure steel side gates typically take 2 to 3 weeks. Duplex galvanised and powder-coated driveway pairs run 4 to 6 weeks, and automated sliding steel gates take 5 to 8 weeks.
Why proper EN ISO 1461 hot-dip galvanising adds a week to the schedule, and how to time piers and tarmac ahead of hanging day.
Free, no obligation. One local fabricator prices it, not five.
- 2–3 wksgalvanised steel side gate
- 4–6 wksduplex driveway steel pair
- 5–8 wksautomated sliding steel
- 5 to 7 daysconcrete cure before hanging

What happens week by week once you approve a workshop quote
- Week 1: Laser survey and workshop drawing sign-off. The fabricator checks pier lean at three heights, confirms swing clearance or run-back wall length, and locks in box gauge, finial profile and RAL colour.
- Weeks 2 to 3: Cutting, jig welding and dressing. Main box frames, verticals, automation rails, lockboxes and hinge lugs are cut, fully seam-welded square, dressed smooth and vent-drilled.
- Weeks 3 to 4: Hot-dip galvanising plant and duplex powder coat. Welded frames travel to an Irish galvanising plant for acid pickling and 450°C zinc dipping (5 to 10 working days in peak spring months), then move to sweep-blasting and oven-baked polyester powder coating.
- Civils and hanging day (1 to 2 days on site). Any new steel hanging posts, underground motor pans or sliding concrete beams are poured and cured for 5 to 7 days first. Manual driveway pairs hang in one day; automated pairs with intercom commissioning take one to two days.
Price my steel gate
Four quick taps and our price shows before we ask for a phone number. One local fabricator rings you, not five.
Galvanised box-section steel gates, about 3 m wide, manual: €1,800 to €3,400, hot-dip galvanised and fitted.
How this steel gate estimate works
The range reflects typical Irish workshop supply-and-fit figures for hot-dip galvanised (EN ISO 1461) and powder-coated steel gates hung in a ready opening. Manual driveway totals cover box-section leaves, adjustable eye hinges, drop bolts, stop and hanging. Electric choices add motors, dual photocells and remotes. Masonry piers, concrete sliding beams, cantilever counterbalance pads and certified armoured cable runs vary by site and are itemised after measurement. Confirm whether VAT is quoted at 13.5% or 23%.
Ordering steel gates alongside driveway paving or pier builds
- Bury ducts and ground beams before tarmac or cobble. Laying 50 mm power ducts, cross-driveway photocell sleeves, underground boxes and sliding track beams ahead of the paving crew avoids cutting fresh tarmac.
- Wait until piers are capped and rendered before final fabrication. Plaster render adds 20 mm to 30 mm per pier face; final laser dimensions taken after plastering guarantee crisp hinge gaps.
- Allow extra buffer from March to July. Irish galvanising baths and metal fabricators hit peak order books in late spring; booking your survey two months ahead keeps summer deadlines safe.
- Short lead times can signal skipped galvanising. Be wary of a 5-day promise on custom coloured steel driveway gates; genuine hot-dip galvanising plus sweep-blast powder coat requires real plant turnaround.
Related steel fabrication guides
Galvanising vs powder coatEN ISO 1461 zinc microns, sweep blasting and duplex finishes.
Steel gate pricesFull Irish pricing by frame build, width, motors and groundworks.
VAT on steel gatesHow Revenue's two-thirds rule splits 13.5% and 23% invoices.
Box-section driveway gatesWelded 50×50 and 60×60 galvanised pairs priced by width.
Sliding steel gatesV-groove ground track vs suspended cantilever steel rails.
Gate leaf weights & piersPier leverage loads, strip footings and hidden hanging posts.Questions fabricators hear most
Why does hot-dip galvanising add 1 to 2 weeks to steel gate delivery?
Workshops batch welded frames onto lorries for specialist Irish galvanising plants, where steel goes through degreasing, acid pickling, fluxing, 450°C dipping and cooling before moving on to the powder coater.
How long are steel gate fitters actually on my driveway?
A galvanised steel side gate takes half a day. A manual double steel driveway pair hangs in one day; an automated pair or tracked sliding steel gate with intercom setup takes one to two days.
Can I hang steel gates immediately after concreting new steel posts?
No. Heavy welded steel leaves put immediate lever pull on fresh concrete; let post footings and cantilever counterbalance pads cure for 5 to 7 days first.
Steel gate types and fabrication guides
Steel gate types
Fabrication & specs

Book your survey ahead of the spring queue
Check your guide range in the planner so one county fabricator confirms current workshop turnaround.